AP NETWORK / ONLINEFIELD MANUAL SERIESPUBLIC ACCESSREF // AP-HQ-001
APPALACHIAN PREPAREDNESSFIELD DIVISION // PUBLIC BRIEF

PRIVATE PLANNING • 7 / 30 / 90 DAY ROADMAP

Readiness planner

Turn broad household needs into a build order. Set the planning basis, establish the first corrections and move from assumptions to tested capability.

STATUS / ACTIVECLASS / PUBLICFORMAT / FIELD INTELLIGENCE

OPSEC BY DESIGN // DEVICE-LOCAL

Plan the capability—not the sensitive details.

This planner stores broad selections and task progress only in this browser. Do not enter names, addresses, exact routes, access codes, weapon locations, defensive positions or detailed medical information.

LOCAL STORAGENO ACCOUNT REQUIREDPRINTABLE ROADMAP

STEP 01 // SET THE PLANNING BASIS

Household profile

Use broad planning factors. The output is a starting roadmap, not a professional assessment or guarantee.

CLASS / PRIVATE TO THIS DEVICE
01

People and coverage

Establish the basic reserve requirement.

Target coverage
02

Residence type

Adjust for storage, shared systems and shelter.

03

Priority conditions

Select the disruptions that should move earlier in the build order.

04

Support factors

Select only broad needs; do not enter diagnoses or personal details.

05

Build pace

Choose a workload—not a financial disclosure.

OUTPUT7 / 30 / 90-DAY CAPABILITY ROADMAP

Changing the planning basis keeps completion marks for tasks that still apply.

STEP 02 // WORK THE BUILD ORDER

Household capability roadmap

Complete the smallest useful step, verify what you actually have and test the system under calm conditions. A checked box records completion—not guaranteed performance.

0%0 / 18 ACTIONS
PLAN DATEPendingPLANNING BASISUSER-SELECTEDBASELINENOT DETECTEDVALIDATIONUNTESTED UNTIL PRACTICED
WATER BASELINE56 GAL

4 people × 14 days; add for pets, heat or health needs

MEAL-PORTION TARGET168

Three usable portions per person/day; match real dietary needs

WORKLOAD PACE2 / WEEK

Balanced build order

NEXT TEST DATEPending

Retest after meaningful changes or an actual disruption

PHASE 01

7-day corrections

Close immediate life-safety and information gaps.

0 / 5 COMPLETE
PHASE 02

30-day foundation

Build dependable reserves and operating procedures.

0 / 8 COMPLETE
PHASE 03

90-day resilience

Add redundancy, test the plan and correct failures.

0 / 5 COMPLETE

Planning source: Federal preparedness guidance supports maintaining several days of supplies, creating a household plan and accounting for individual needs. Water uses the CDC baseline of at least one gallon per person per day, with a three-day minimum and a two-week supply where possible.

PLAN → TEST → CORRECT → RETEST

Put the roadmap under calm pressure.

Run timed power, water, evacuation and severe-weather exercises. The device-local after-action record scores observable performance and schedules the next test.

Open field exercises

PRIMARY GUIDANCE

Use official instructions when conditions change.

This roadmap is educational. It does not replace emergency services, official orders or qualified medical, electrical, utility, structural or public-safety professionals.

Ready.gov — Build a Kit ↗Ready.gov — Make a Plan ↗CDC — Emergency Water Supply ↗

WHEN THE ROADMAP NEEDS PROPERTY-SPECIFIC VALIDATION

Move from broad planning to private assessment.

A paid remote assessment reviews all ten systems, separates evidence from assumptions and produces a phased, budget-aware roadmap. Selective on-site work and full readiness implementation are quoted privately after application.

Apply for assessment

READING DEVICE-LOCAL ROADMAP…